Zf640

Zf640. SBMA Chairman and Administrator Rolen C. Paulino (in white polo shirt) inspects the on-going construction of Magsaysay Bridge which links the city of Olongapo and the Subic Bay Freeport zone on Friday, March 25. He urged the contractors to expedite the construction of the said bridge as it delays the development of the Subic Bay Freeport Zone.

We called that bridge and I still do: “The Main Gate Bridge”. During our time that was the only way to Magsaysay Drive in Olongapo City and that was a top priority for many of us Marines and Sailors when Liberty Call went down.

This construction of a new bridge to replace it has been dragging on at least 2 years, I believe.

The new SBMA Chairman had a look, so the Subic News Link says, this is the URL: http://subicnewslink.blogspot.com/2022/03/look-sbma-chairman-inspects-magsaysay.html

In the previous page (page 22) of this thread, the Main Gate Bridge or Magsaysay Bridge is shown several times and shows the slow progress of the construction

Leave a Reply

Your email address will not be published.