Barrio Barretto Bypass Road

 

Zg619. (#41) image is the ridgeline where the road cut is made deeper and the material is used for fill to build the road further on.

————————————

In our larger Subic Bay and Olongapo City area a road construction has been started which is called “Barretto Bypass”. Many of people that live here are interested in such a project because the traffic on the National Road from Olongapo to Zambales is bad at times.

————————————

======================

Bo. Barretto Bypass Rd. 23-11-22 Second Segment

On my walk today, the 22nd Nov. 2023, to Naugsol, I saw work going on at the Barretto Bypass road, so I changed my direction to that project and took pictures. I will call these pictures Barretto Bypass 2nd Segment. For this presentation in my webpage I chose 13 images and the numbering system I used, refer to 62 images I posted in these 2 two venues if you are interested:

—-Uploaded 62 pics into this FB album Album URL, click here: 

 

Or the posting URL, click here:   

—-Uploaded 62 images to this Photobucket album at 2023 OC, BB, SB, SBFZ,Zam album group, No 2 Phil Events by year, Philippines incl. my walking, click here:

 

—————————————

#00 to #05 images are maps or data information of the Barrio Barretto Bypass Road Project.

Zg610. (02) Barretto Bypass.

——————————

#06 to #19 images are starting with my glimpse of the Barretto Bypass project is continuing over the 2nd ridge, the culverts put in place for the creek in this valley which gives you an idea where the road is heading. The remaining pictures show the work going on from the culverts to the 2nd ridge and area views I shot for your orientation.

Zg611. (06) Barretto Bypass.

Zg612. (10) Barretto Bypass.

Zg613. (11) Barretto Bypass.

Zg614. (14) Barretto Bypass.

Zg615. (15) Barretto Bypass.

—————————————-

#20 to #35 images are of many shots as I reach the ridge I labeled “A 2nd Ridgeline”, views and the road going up and thru the ridge. The other images are of the area between the “2nd Ridgeline” and the ridge which is used right now to get fill.

Zg616. (33) Barretto Bypass.

Zg617. (35) Barretto Bypass.

—————————————

#36 to #43 images are of the ridgeline where the road cut is made deeper and the material is used for fill to build the road further up.

Zg618. (37) Barretto Bypass.

Zg619. (41) Barretto Bypass.

——————————————–

#44 to #47 images are of the place where the present phase of the Barretto Bypass road starts; a concrete culvert bridge is being built. It looks like that it will have 4 lanes. The engineers are hanging out here and said the road will go up to Kalaklan Ridge.

Zg620. (46) Barretto Bypass.

———————————————

#48 to #55 images are of the stretch of road from the 4 lane culvert job back to the solid bridge over the Matain River.

No pictures chosen.

————————————-

#56 to #61 images of the bridge over the Matain River, the river and a section of road which receives a better embankment and we have a parting shot of the Barretto Bypass road going thru the woods and the ridgelines

Zg621. (56) Barretto Bypass.

Zg622. (59) Barretto Bypass.

——————————————————

My 1st Segment of the Barretto Bypass Rd. presentation in Facebook is this URL, Click here:

 

 