Image #25: Images #17 to #27 are views of descending from the 2nd Ridge-Cut to the end of this about 800 meter Barretto Bypass Road segment. It appears another pipe culvert is required, some drainage damage occurred and indeed it seems this is work about this segment only and no further advance is going on at this time.
——————————————————–
On one of my weekly exercise walks from the new family lot, back to our main family residence in Barrio Barretto, I had an update look at the about 800 meter long segment of the Barretto Bypass Road, in the works now.
25 images!
29 images are in this FB album, click here:
————————————————————
Images #01 to #08 are of my walk along the Matain River to and across the Barretto Bypass Road Bridge. I noticed road concrete work is in progress from the bridge towards the 800 meter Barretto Bypass Road segment. The worker who is stuffing 6 short pieces of pipe with concrete told me THOUGH:”The two concrete trucks standing by ARE NOT FOR THE BYPASS ROAD, they are for the bases of a high voltage line (towers) running across the hills in the Sitio Alibang, an Aeta/Negrito reservation next to this bypass project”.
#01 image.
#02 image.
#03 image.
#04 image.
#05 image.
——————————————————————————————————————————
Images #05a & #05b are Google Earth images for your orientation of this Barrio Barretto Bypass Road project, marked up, to support the pictures in this album.
#05a image.
#05b image.
——————————————————————————–
#06 image.
#07 image.
———————————————————————————————————————–
Images #09 to #11 are of the First Ridge Cut, the finished concrete box culvert, and some of the contractor’s parked heavy equipment.
#09 image.
#10 image.
#11 image.
————————————————————————————————————————————————
Images #12 to #16 are views of my walk from the First Ridge Cut to the 2nd Ridge Cut with two views across the Matain River Valley in this Barrio Naugsol area. Not too much has changed since my last walk but it appears culvert pipes have been dropped off at the low point between the two ridge cuts. I guess the recent rain demonstrated a culvert is required at this point.
#12 image.
#13 image.
#14 image.
#15 image.
—————————————————————————————————————————
Images #17 to #27 are views of descending from the 2nd Ridge-Cut to the end of this about 800 meter Barretto Bypass Road segment. It appears another pipe culvert is required, some drainage damage occurred and indeed it seems this is work about this segment only and no further advance is going on at this time.
#17 image.
#18 image.
#19 image.
#20 image.
#21 image.
#22 image
#23 image.
#24 image.
#27 image.