Media Category: Ze

Started this new category because Zc is full

Ze551

Ze551

Ze551. We are now approaching the Jadjad Bridge from the other side and are driving in the direction towards SBFZ along the Subic-Tipo Expressway. Work is going on for the 2nd bridge over the Jadjad River. Here the road widening will be easier; the north side of the road is flat.

Read More
Ze550

Ze550

Ze550. We are now approaching the Jadjad Bridge from the other side and are driving in the direction towards SBFZ along the Subic-Tipo Expressway. Work is going on for the 2nd bridge over the Jadjad River.

Read More
Ze549

Ze549

Ze549. This is the first picture of going into the SBFZ direction on the Subic-Tipo Expressway and this is the place of the eliminated toll gate was. This picture has a reflection from my dashboard, here the north side of road is flat and the widening will be easier here.

Read More
Ze548

Ze548

Ze548. This used to be the place of the Subic-Tipo Expressway toll gate and that organization had a place of operation here, which the road is going to it. The Subic-Tipo Expressway was incorporated into the North Luzon Expressway and this toll gate was eliminated.

Read More
Ze547

Ze547

Ze547. We just crossed the Jadjad River Bridge and on this side work has started to build another two lane bridge over the Jadjad River for the Subic-Tipo Expressway.

Read More
Ze546

Ze546

Ze546. We are approaching the Jadjad River and bridge, here at the north side of the Subic Expressway is flat land which can be easily widened.

Read More
Ze545

Ze545

Ze545. We are approaching the SBFZ Tipo security gate; here at the north side of the Subic Expressway is flat land which can be easily widened.

Read More
Ze544

Ze544

Ze544. We are at the SBFZ end of the Subic-Tipo Expressway tunnel and here a new tunnel needs to be cut.

Read More
Ze543

Ze543

Ze543. We are at the SBFZ end of the Subic-Tipo Expressway tunnel and here a new tunnel needs to be cut.

Read More
Ze542

Ze542

Ze542. Some areas along the north side of the Subic-Tipo expressway are flat and can be widened easy, at other areas the embankment has to be cut down. We are getting close to the tunnel.

Read More