Zbcdsg059

Fort Drum Construction, El Fraile Island from CDSG, SW View.

This view shows one of two turret pans being lowered. This is a picture of Ft. Drum under construction on Fraile Island in Manila Bay, given to me Glen Williford, a leader in the Coastal Defense Study Group (CDSG). The original picture name was:
Pcon-199 77F-111-135-223 Ft Drum lowering pan 4-1917-p18b7ve5mp1i321fpbihqaei9m

Leave a Reply

Your email address will not be published.