Honolulu Rail Transit Project.

Ze528. Honolulu Rail Transit, Aloha Stadium Station #9 is being finished.
——————————————-
The Honolulu Rail Transit Project is making progress; here is the project’s web side, click here or copy and paste the URL:

https://www.honolulutransit.org/

Here is the URL for the map, click here or copy and paste the URL.

http://cchnl.maps.arcgis.com/apps/OnePane/basicviewer/index.html?appid=645f714ffdc742e7825023b80b99793d

How-a-20-mile-train-line-swelled-into-a-9-billion-debacle, click here or copy and paste this URL:

https://www.wsj.com/articles/how-a-20-mile-train-line-swelled-into-a-9-billion-debacle-11553270393
—————————————————-

Ze529. Honolulu Rail Transit, Aloha Stadium Station #9 is being finished.

Ze530. The Honolulu Rail Transit track is running over H1 Freeway along the Kamehameha Hwy. in Pearl City.

Ze531. This is underneath, the bottom of H1 Freeway, as it underpasses the new Honolulu Rail Transit Track in Pearl City. I couldn’t resist this shot since it such a wide highway.

Ze532. The Honolulu Rail Transit West Loch Station #4, at the end of West Waipahu is being finished.

Ze533. The Honolulu Rail Transit West Loch Station #4, at the end of West Waipahu is being finished.

Ze534. The Honolulu Rail Transit Project Track, in a distance, is running over the Kunia-Ewa Road, in this picture we can see some of the track.

Seven more images added 2019-10-05.

Ze584. The Honolulu Rail System is also called “HART” which stands for Honolulu Authority for Rapid Transportation. This sign stood near the Makalapa Gate.

Ze585. This is one of two machines at work for HART, this one is at the Makalapa Gate; the other one is near the airport.

Ze586. This is one of two machines at work for HART, this one is at the Makalapa Gate. They lift pieces into place and advance by extending to the next Pile-Foundation.

Ze587. These are the foundation pilings for HART; I’m standing at the intersection of Valkenburgh and Nimitz and I’m looking west. Behind me is the FRA Home which by the way is saved by the Hawaii National Guard.

Ze588. On my walk on the Pearl Harbor Bicycle Path I came across this sign, it is related to HART, the Honolulu Rapid Rail System. This is about 150 meters from the entrance to McGrew Housing.

Ze589. On my walk on the Pearl Harbor Bicycle Path I came across this sign (zoomed in), it is related to HART, the Honolulu Rapid Rail System. This is about 150 meters from the entrance to McGrew Housing.

Ze590. On my walk on the Pearl Harbor Bicycle Path I came across this sign (cropped now), it is related to HART, the Honolulu Rapid Rail System. This is about 150 meters from the entrance to McGrew Housing.

—————————————-

On the 21st of Oct. 2019 I added these three pictures of the special machine that lays the tracks between the pile posts on the Honolulu Rail Project.

Ze591. This is one of two machines at work for HART (the Honolulu Rail Project), this one is just east of the Makalapa Gate. They lift pieces into place and advance by extending to the next Pile-Foundation. We have been here a month and the machine doesn’t seem to move or it is just creeping along. This is one of three images shot on the 7th Oct. 2019.

Ze592. This is one of two machines at work for HART (the Honolulu Rail Project), this one is just east of the Makalapa Gate. They lift pieces into place and advance by extending to the next Pile-Foundation. We have been here a month and the machine doesn’t seem to move or it is just creeping along. This is one of three images shot on the 7th Oct. 2019.

Ze593. This is one of two machines at work for HART (the Honolulu Rail Project), this one is just east of the Makalapa Gate. They lift pieces into place and advance by extending to the next Pile-Foundation. We have been here a month and the machine doesn’t seem to move or it is just creeping along. This is one of three images shot on the 7th Oct. 2019.

Ze643. This map shows the Kam Hwy and Center Drive intersection, the Honolulu Rail Project is advancing, although slowly.

Ze644. This is one of seven images showing the Honolulu Rail Project has reached the intersection of Kamehameha Highway and Center Drive. Another machine is between here and the airport and is advancing there.

Ze645. This is one of seven images showing the Honolulu Rail Project has reached the intersection of Kamehameha Highway and Center Drive. Another machine is between here and the airport and is advancing there.

Ze646. This is one of seven images showing the Honolulu Rail Project has reached the intersection of Kamehameha Highway and Center Drive. Another machine is between here and the airport and is advancing there.

Ze647. This is one of seven images showing the Honolulu Rail Project has reached the intersection of Kamehameha Highway and Center Drive. Another machine is between here and the airport and is advancing there.

Ze648. This is one of seven images showing the Honolulu Rail Project has reached the intersection of Kamehameha Highway and Center Drive. Another machine is between here and the airport and is advancing there.

Ze649. This is one of seven images showing the Honolulu Rail Project has reached the intersection of Kamehameha Highway and Center Drive. Another machine is between here and the airport and is advancing there.

Leave a Reply

Your email address will not be published. Required fields are marked *